A six-week rambler rehab, kept in view.

See how an investor protects a cosmetic-remodel baseline, schedules every trade, and forecasts kitchen-opening risk before it threatens the targeted exit window and cash-on-cash return.

1961 Rambler 3 bed / 1 bath · 1,058 sq ft · Value-add flip

Acquisition

$450,000

Closed Sep 18 · value-add flip

Estimated ARV

$650,000

Target listing Nov 2

Rehab duration

6.0 weeks

Six-week critical path

Today's control point

Kitchen opening

Field condition controls rough-in release

02 · Protected baseline

The original plan stays intact.

RehabIQ keeps the approved starting point visible while the team evaluates a possible field condition. Forecasts help make decisions; they never rewrite history or become actuals.

Original baseline

$72,000

Approved before work began. Locked for comparison.

Revised forecast

$72,000

No forecasted changes approved.

Committed / actual to date

$19,500

Committed entries only. Final actuals are not known.

Budget categoryOriginalCommittedControl note
Kitchen opening + peninsula$11,000$6,200Forecasted hidden-condition review
Cabinets, counters + backsplash$15,000$3,600Installation follows rough-in
Bath tile surround + vanity$8,500$2,100Materials approved
Electrical panel + furnace$12,000$4,500Rough-in dependency
Paint, doors, trim + lighting$10,500$0Finishes phase
Exterior, fencing + cleanup$6,000$2,000Site work underway
Appliances$5,000$0Delivery coordinated
Contingency$4,000$0Held at baseline

03 · Live job schedule

Every trade, handoff, and risk in one six-week board.

This seeded contractor calendar is the project's critical path—not a live multi-user integration. Schedule confirmation and field-work status are intentionally tracked as separate signals.

Target listing windowNov 2–4

Rambler Live Job Schedule

16 scheduled assignments · six-week critical path · seeded demo

Download the selected week as an .ics calendar export. This demo download does not provide live Google, Apple, or Outlook syncing.

Week 2 · Sep 28–Oct 2

Opening + rough-in

Tap an assignment to inspect its contractor handoff.

Schedule: ConfirmedWork: In progress

Critical path conflict to resolve

Kitchen framing must clear before electrical, HVAC, plumbing, and rough inspection. A hidden condition could collide with those confirmed/sent handoffs and squeeze the Oct 28 staging plus Oct 30 photography window.

04 · Change-order control

Approve a forecast without erasing the plan.

This decision simulates a kitchen-opening hidden condition. Approve it to update the revised budget and future schedule forecast; the locked original baseline and unknown actuals stay separate.

CO-01 · Kitchen opening

Possible framing and utility correction discovered while opening the wall. The scope is forecasted pending investor approval.

Decision pending

Forecasted cost

+$6,800

Forecasted schedule

+4 days

Affected handoff

Inspect / rough-in

Control rule

Original: $72,000 remains protected.

Revised: budget and planned dates change only after approval.

Actual: remains unknown until work and invoices are completed.

05 · Verify the work

Document each handoff before releasing the next crew.

The demo uses seeded documentation states to show how field photos, sign-off, and quality checks can support completion—not replace contractor coordination.

Kitchen opening documentation

Before-wall, framing, and utility-condition placeholders are queued against the critical path.

4 photos required
Completion sign-off gates rough-in release.

Listing-ready check

Staging and photography remain visible as separate scheduled assignments, so a finish delay is not hidden in a generic closeout list.

Delivery and access notes stay attached to each assignment.

06 · Learn for next time

A completed rehab becomes better operating data.

At closeout, RehabIQ compares the protected original baseline with approved revisions and final actual results—then uses the gap to improve the next project.

Original budget

$72,000

Locked baseline

Revised forecast

$72,000

No forecast approved

Actual cost

Unknown

Project in progress

Schedule variance

Unknown

No delay confirmed

Ready for your next renovation?

Plan the work. Schedule the crew. Control the costs.